Home » News » Industry News » How To Run Pipe for Infloor Heat​

How To Run Pipe for Infloor Heat​

Views: 0     Author: Site Editor     Publish Time: 2025-01-14      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

When it comes to installing radiant floor heating, particularly hydronic systems, one of the most common questions homeowners and contractors ask is about how to run the pipe or tubing for in-floor heat. The piping system is the backbone of any radiant heat system, and the correct installation can significantly impact the system's efficiency, durability, and cost-effectiveness. This article aims to guide you through the process of running the pipe for radiant floor heat in different flooring types and applications. We’ll also delve into specific tools, equipment, and installation techniques that help optimize the system for long-term performance.


Understanding the Core Components of Radiant Floor Heating Systems

Before diving into how to run the pipe for in-floor heat, it’s essential to understand the basic components that make up a radiant floor heating system. These systems can be divided into two primary categories: hydronic radiant floor heating and electric radiant floor heating.

  • Hydronic radiant floor heating uses hot water that circulates through pipes installed in the floor. This is typically the most efficient type of system, especially in larger installations.

  • Electric radiant floor heating relies on heating cables or mats embedded in the floor, which can be easier to install, but it’s typically more expensive to operate over the long term.

Both systems require high-quality Pipeline System Equipment, including durable tubing, manifolds, and various fittings. Whether you’re laying down the pipes for a hydronic radiant floor heating installation or installing an electric system, understanding the pipe layout and installation process is crucial for efficiency.


Choosing the Right Tubing for In-Floor Heat

The primary element that carries the heat through the floor is the tubing. For hydronic systems, the tubing is typically made of PEX (cross-linked polyethylene) because it’s flexible, durable, and easy to work with. Here's a brief overview of tubing types:

  • PEX-a (PEX alpha): Offers superior flexibility, which is beneficial when running pipes through tight spaces.

  • PEX-b (PEX beta): More rigid than PEX-a but still widely used due to its resistance to scale build-up and its affordability.

  • PEX-c (PEX gamma): Less common but still available, offering a balance of flexibility and rigidity.

When selecting your tubing, ensure it’s rated for high pressure and temperature to prevent any potential failure down the line. For a hydronic radiant floor heating system, you will need high pressure valves and fittings to manage the flow of hot water effectively and safely.


Materials Required for Installing Radiant Floor Heating

To install a radiant floor heating system, whether for a concrete slab radiant floor heating installation or another application, you will need the following materials:

  • PEX Tubing: The main material that will carry heated water through your system.

  • Manifolds: Distribute the heated water from the boiler to various parts of the tubing.

  • Insulation: Helps to prevent heat loss and directs heat toward the floor.

  • Fittings: High-pressure fitting types like elbows and tees are needed to connect the tubing sections and ensure a proper flow.

  • Aluminum Heat Transfer Plates: These are placed under the tubing to maximize heat distribution and efficiency.

  • Reflective Barriers: Used to reflect heat upward into the floor, enhancing the system’s efficiency.

Additionally, specialized equipment like Vermeer trenchless equipment and directional drilling machines can be used to run pipes under concrete slabs or across long distances, minimizing the need for major disruption to the existing structure.


Step-by-Step Guide to Running Pipe for In-Floor Heat

Now that we’ve covered the basics, let’s walk through the process of installing the piping for radiant floor heat. Whether you’re working with a concrete slab, subfloor plywood, or floor joists, the steps for laying the piping will vary slightly.

1. Preparing the Subfloor for Radiant Heat

Preparing the surface is a critical first step in the process. If you’re installing radiant floor heating in an existing house, you’ll need to assess the current floor condition and determine whether any repairs or preparation are required before laying down the tubing.

  • For concrete slabs: Ensure that the slab is free of cracks and damage. A vapor barrier should be installed over the subfloor to prevent moisture from seeping into the tubing and insulation.

  • For wooden subfloors (plywood): Clean the surface thoroughly, and if necessary, level any uneven areas before starting the installation.

2. Installing the Insulation and Reflective Barriers

Once the subfloor is prepared, the next step is to install insulation and reflective barriers. This is particularly crucial for hydronic radiant floor heating, as it will help direct the heat upward toward the floor instead of being lost into the ground or lower levels.

  • Insulation: Rigid foam boards or foam sheets can be placed under the tubing. If you’re working on a suspended floor, consider placing fiberglass insulation between the joists to improve heat retention.

  • Reflective barriers: These barriers help bounce heat upward toward the subfloor. You can install aluminum reflective barriers between the joists for suspended floors or under the insulation for slab installations.

3. Running the PEX Tubing

Once the insulation and reflective barriers are in place, it’s time to lay down the PEX tubing. This is a relatively straightforward process, but attention to detail is important for ensuring optimal heat transfer.

For Concrete Slab Installations:

  • Use a Crete-Heat system or another similar product to secure the tubing in place. This involves stepping the tubing into pre-formed nubs on the insulation boards, which helps hold the tubing firmly while the concrete is poured.

For Subfloor Plywood:

  • Lay down aluminum heat transfer plates and secure the tubing with PEX clips or staples. The plates ensure that the heat is transferred efficiently from the tubing to the floor above.

  • Ensure the tubing is spaced correctly according to your system’s specifications, typically around 8 inches apart, depending on the heat requirements.

For Floor Joists:

  • Run the tubing between the floor joists, using clips or ties to secure the PEX tubing in place. Manifolds should be used at the end of each loop of tubing to connect the tubing to the main source of heated water.

4. Testing the System

Before sealing the system with concrete or flooring, you’ll need to conduct a pressure test to ensure that there are no leaks in the tubing. This is a crucial step in the installation process, as it will save you time and cost if any issues arise before the floor is finished.

  • Pressure test: Use a high-pressure valve or a specially designed high-pressure pneumatic valve to test the integrity of the piping system.

  • Water flow test: Ensure that water is flowing evenly through the system and that the pressure is maintained consistently.

5. Pouring Concrete (for Slab Installations)

If you’re installing radiant floor heating on a concrete slab, now it’s time to pour the concrete over the tubing. The concrete mix should be carefully selected to avoid damage to the tubing. Use a lightweight concrete mix or a mix specifically designed for radiant floor heating.

  • Make sure the slab is at least 1.5 inches thick to effectively encase the tubing and allow for efficient heat transfer.

6. Installing the Final Flooring

Once the tubing is securely in place and tested, you can proceed with installing the final floor covering. For carpet, vinyl, or soft flooring, you’ll need to install a thin layer of plywood or luan on top of the tubing to ensure proper coverage. For hardwood or tile floors, the heat transfer plates should be directly under the finished flooring.


Maintenance and Troubleshooting

After installation, it’s essential to maintain your radiant floor heating system. This includes checking for leaks, ensuring the pressure remains stable, and cleaning or replacing any filters as needed.

  • Leaks: If you notice any areas of the floor that aren’t heating up, check the tubing for leaks. Use a pressure gauge to check for any drops in pressure.

  • Airlocks: If you have a hydronic system, ensure that there are no airlocks in the piping. Bleed the system as necessary to remove air from the pipes.


Conclusion

Running pipe for radiant floor heat is a critical aspect of installing an efficient and effective radiant heating system. Whether you’re installing radiant heat in concrete slabs, plywood subfloors, or floor joists, understanding the process and choosing the right Pipeline System Equipment is essential. Following the correct installation steps and using the appropriate tools and materials will ensure that your radiant floor heating system performs efficiently, saving you money on energy costs while providing consistent comfort in your home.


TONTR is located in the beautiful coastal city of Qingdao. It is a professional national-level high-tech industry engaged in the design, development, manufacture and sales of high-pressure pipeline systems.
 +86-18353221838

Quick Links

Product Category

Contact Us
Copyright @ 2023 Qingdao Tontr Pipeline System Co., Ltd. All rights reserved.  Sitemap  | Support By Leadong