S14
TONTR
S14
Grooved Reducer
Groove connection
1"~12"
Qingdao, China
less pressure
60000 tons/year
Regular is red/Can Customize
Availability: | |
---|---|
Tontr Ductile Iron Grooved Split Flange for Fire Fighting
Product Details:
Material:Malleable Iron
Maximum Pressure:25 BAR (363PSI) (2.5MPA) CLASS 150
Maximum Temperature:200°C (392°F)
Tensile Strength≥More than 350MPA
Hardness≥HB150 (Brinell)
Elongation Rate≥10%
Suitable Applications:Water, Gas, Fire-fighting system etc.,
Standard:EN10242 / ANSI / ASME B16.3 / DIN2950 / IS0 49 / GB/T3287
Threaded Standard:EN10226 / ASME B.1.20.1 / DIN2999 / IS554
Size:From 1/2'' to 2''
Surface:Galvanized/Black
Packing Details:Cartons with/without pallets, Double woven bags, Plywood case
Delivery Details:According to the quantities and specifications of each order. Lcl/Fcl/Bulk vessel can be selected
Normal delivery times are from 15 to 45 days after receiving the deposit.
Place of shipment:Qingdao, Shanghai
Shipping Ways:By sea, it is convenient for bulk orders.
Cheap shipping cost, usually takes 30-60 days.
By air, quick delivery, for high value and light weight orders.
Cheaper than Express. Takes around 7-12 days.
By express, samples, and small order.
A little expensive, but very quickly, usually 7-10 days, door to door.
Tontr Ductile Iron Grooved Split Flange for Fire Fighting
Product Details:
Material:Malleable Iron
Maximum Pressure:25 BAR (363PSI) (2.5MPA) CLASS 150
Maximum Temperature:200°C (392°F)
Tensile Strength≥More than 350MPA
Hardness≥HB150 (Brinell)
Elongation Rate≥10%
Suitable Applications:Water, Gas, Fire-fighting system etc.,
Standard:EN10242 / ANSI / ASME B16.3 / DIN2950 / IS0 49 / GB/T3287
Threaded Standard:EN10226 / ASME B.1.20.1 / DIN2999 / IS554
Size:From 1/2'' to 2''
Surface:Galvanized/Black
Packing Details:Cartons with/without pallets, Double woven bags, Plywood case
Delivery Details:According to the quantities and specifications of each order. Lcl/Fcl/Bulk vessel can be selected
Normal delivery times are from 15 to 45 days after receiving the deposit.
Place of shipment:Qingdao, Shanghai
Shipping Ways:By sea, it is convenient for bulk orders.
Cheap shipping cost, usually takes 30-60 days.
By air, quick delivery, for high value and light weight orders.
Cheaper than Express. Takes around 7-12 days.
By express, samples, and small order.
A little expensive, but very quickly, usually 7-10 days, door to door.